Growth Wise measures four coordination metrics from your actual transcripts. Every finding comes with a direct quote and a timestamp. The baseline is agreed at kickoff. The shift is measured at the end. No guesswork.
Growth Wise reads the transcript and identifies a pattern. For example: “This planning meeting shifted to a status update at 14:22. Nobody named the shift. The group spent 18 minutes in the wrong cognitive mode.”
The finding is presented without blame. “The planning arena lacks an explicit decision rule for trade‑offs. Without one, the group defaults to familiar territory: reporting status.” The conversation moves to process, not people.
A specific protocol is designed for the next meeting. “Open planning with: ‘What trade‑offs do we need to make?’ Establish the decision rule before discussion begins.” One small change, tested immediately.
At kickoff, you and the Growth Wise team agree on which metrics matter most for your context. The baseline is measured from your first set of transcripts. At the end of the pilot, the same metrics are measured again.
The shift is co‑owned. You see the raw data, the interpretation, and the recommendations. The executive report connects each metric to specific transcript moments so you can trace every finding back to what actually happened in the room.
These dimensions are agreed at kickoff. You co‑sign the baseline. The shift is measured together.
Start with a diagnostic. Every finding tied to a real moment.
Explore the Design Partner Program →